I drove on the STRR from Hoskote to Devanahalli yesterday with map shared by BHPian @NPV. Took the STRR from Hoskote - Chintamani road to NH-44 near Nandi cross. The road is very good, one-way toll is Rs.70. Returned the same route, and no toll was deducted on the return though.
ankan.m.blr is offline   (2) Thanks
Old 8th January 2024, 12:48   #797
Distinguished - BHPian
 
itwasntme's Avatar
 
Join Date: May 2007
Location: BANGALORE
Posts: 7,394
Thanked: 13,343 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by procrj View Post
Wondering if anyone has driven all the way to/from Kolar on this road?
Quote:
Originally Posted by ankan.m.blr View Post
I drove on the STRR from Hoskote to Devanahalli yesterday with map shared by BHPian @NPV. Took the STRR from Hoskote - Chintamani road to NH-44 near Nandi cross. The road is very good, one-way toll is Rs.70.
I'd suggest taking SH96 only if you are looking for a idyllic drive, i.e. not focused on reaching the destination within an expected timeframe. STRR should be a fair deal faster + a more safe drive given the wider + divided carriageway.
itwasntme is online now  
Old 31st January 2024, 17:47   #798
BANNED
 
Join Date: Mar 2011
Location: hump city
Posts: 1,293
Thanked: 5,879 Times
Re: On Bypassing Bangalore

Thanks to the help and guidance from experts here, was able to use STRR to skirt around Blore , between Hoskote <--devanahalli-doddaballapura-->Dobbaspet. Of course some stretch around Doddaballapura is incomplete/potholed, however it's but a minor inconvenience.

Last edited by venkyhere : 31st January 2024 at 17:49.
venkyhere is offline   (1) Thanks
Old 4th February 2024, 10:07   #799
Distinguished - BHPian
 
Rajeevraj's Avatar
 
Join Date: Aug 2011
Location: Bangalore
Posts: 4,715
Thanked: 18,378 Times
Re: On Bypassing Bangalore

Took the STRR between Devanahalli and Hoskote. Good road and quite impressive. Fairly empty currently. Although I expect truck traffic will pick up once the Hoskote interchange is done and also the pending works in the dodaballapur dabspet area gets done. Expect significant increase once the connect to Hosur road is done. Is there any target timeframe around that ?

This will be a proper Bangalore bypass and since it is so far out, I guess will not be too useful or viable for semi local traffic. Maybe still useful for people living in the peripheries like Hosur, Sarjapur, Hoskote.

But that is why it is called an STRR
Rajeevraj is offline   (1) Thanks
Old 28th February 2024, 12:44   #800
BHPian
 
Join Date: Apr 2005
Location: Bangalore
Posts: 314
Thanked: 148 Times
Re: On Bypassing Bangalore

Bengaluru: First Phase Of STRR Project's Dabaspet-Hoskote Stretch Likely To Open Soon

https://www.timesnownews.com/bengalu...icle-108038426
Selective is offline  
Old 28th February 2024, 13:19   #801
Senior - BHPian
 
Join Date: Dec 2008
Location: Bangalore
Posts: 3,684
Thanked: 5,733 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by Selective View Post
Bengaluru: First Phase Of STRR Project's Dabaspet-Hoskote Stretch Likely To Open Soon
Does that mean the Doddaballapura bypass is actually completed? I had taken the STRR on Feb 2; there was no access to the bypass and it was an excruciating 40 minutes to pass through the ~10-12 km this bypass is supposed to avoid.
binand is online now  
Old 28th February 2024, 13:32   #802
BHPian
 
Join Date: Apr 2005
Location: Bangalore
Posts: 314
Thanked: 148 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by binand View Post
Does that mean the Doddaballapura bypass is actually completed? I had taken the STRR on Feb 2; there was no access to the bypass and it was an excruciating 40 minutes to pass through the ~10-12 km this bypass is supposed to avoid.
Yes, according to the article all the work from Dabaspet to Hoskote will complete in a week or two. Most of the pending work was between Dabaspet and Doddaballapura so, all of that work is completing now. I guess, we will see inauguration ads soon before the election dates are announced.

Last edited by Selective : 28th February 2024 at 13:39.
Selective is offline  
Old 7th March 2024, 07:02   #803
BHPian
 
Join Date: Sep 2014
Location: Ggn->Pune->Blr
Posts: 281
Thanked: 635 Times
Re: On Bypassing Bangalore

It appears Bagalur-Hoskote section will also be operational by this time next year ( could be even earlier).

https://twitter.com/IndexKarnataka/s...m3BBWxfMw&s=19

I feel that it will help truck traffic that currently takes Bagalur- Sarjapur - Dommasandra route ( NH-648 and then SH-35) to go to hoskote, to bypass Bangalore. It will improve the quality of life in Sarjapura area where these trucks frequently cause accidents.
atnyia is offline  
Old 7th March 2024, 07:50   #804
Team-BHP Support
 
ampere's Avatar
 
Join Date: Sep 2009
Location: Bangalore
Posts: 18,180
Thanked: 13,356 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by atnyia View Post
I feel that it will help truck traffic that currently takes Bagalur- Sarjapur - Dommasandra route ( NH-648 and then SH-35) to go to hoskote, to bypass Bangalore. It will improve the quality of life in Sarjapura area where these trucks frequently cause accidents.

Hoskote-Hosur work is happening on steriods. Like I mentioned earlier even the section beyond Hosur Road into NH844 and Denkanikottai Road is happening fast. Earth works are on in full swing. I have witnessed most of these sections myself.

And given the STRR cuts Hosur road beyond Hosur towards Krishnagiri, its a great option to divert the trucks towards Hoskote and there on to Devanahalli.

The only fly in the ointment (and also a very critical piece) the south west quadrant Bannergatta-Kanakpura-Ramagar-Magadi-Dobbaspet needs to happen.

Hopefully rest should be up soon.

Last edited by ampere : 7th March 2024 at 15:40. Reason: typo fixed
ampere is offline   (3) Thanks
Old 7th March 2024, 12:34   #805
BHPian
 
Join Date: Mar 2022
Location: Bengaluru
Posts: 82
Thanked: 95 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by ampere View Post
Hoskote-Hoskote work is happening on steriods. Like I mentioned earlier even the section beyond Hosur Road into NH844 and Denkanikottai Road is happening fast. Earth works are on in full swing. I have witnessed most of these sections myself.
Thanks for the update, do you know where exactly this would cut the hosur Denkanikota road?
W@SIM is offline  
Old 7th March 2024, 15:52   #806
Team-BHP Support
 
ampere's Avatar
 
Join Date: Sep 2009
Location: Bangalore
Posts: 18,180
Thanked: 13,356 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by W@SIM View Post
Thanks for the update, do you know where exactly this would cut the hosur Denkanikota road?
Please see attached:

On Bypassing Bangalore-screenshot-20240307-3.42.378239pm.jpg

On Bypassing Bangalore-screenshot-20240307-3.44.308239pm.jpg
ampere is offline   (2) Thanks
Old 11th March 2024, 08:57   #807
BHPian
 
Join Date: Sep 2010
Location: Bangalore
Posts: 736
Thanked: 2,261 Times
Re: On Bypassing Bangalore

https://www.moneycontrol.com/news/te...-12432761.html

Quote:
Prime Minister Narendra Modi will inaugurate two crucial stretches of Bengaluru Satellite Town Ring Road (STRR) on March 11, which have been built with the aim to reduce traffic congestion in the tech capital.

The two sections are the Dobbaspet–Doddaballapur bypass section of NH-648 (42 km, constructed for Rs 1,438 crore) and the Doddaballapur bypass–Hoskote section of NH-648 (37.6 km, built for Rs 1,317 crore).
airguitar is offline  
Old 11th March 2024, 09:33   #808
Distinguished - BHPian
 
Rajeevraj's Avatar
 
Join Date: Aug 2011
Location: Bangalore
Posts: 4,715
Thanked: 18,378 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by ampere View Post
Hoskote-Hosur work is happening on steriods.

And given the STRR cuts Hosur road beyond Hosur towards Krishnagiri, its a great option to divert the trucks towards Hoskote and there on to Devanahalli.
.
A very critical section in my view. Not only can it take a lot of load off the hosur-attibelle-nice road section, it takes load off nice road and also potentially load off a lot of the smaller roads like Hosur-Bagalur, Attibelle/chandapura - Sarjapur - varthur-hoskote routes and even the KR Puram - Hebbal ORR which sees heavy truck traffic at night.

Looking forward to this stretch opening.
Rajeevraj is offline   (1) Thanks
Old 11th March 2024, 10:16   #809
BHPian
 
Join Date: Sep 2010
Location: Bangalore
Posts: 736
Thanked: 2,261 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by ampere View Post
Hoskote-Hosur work is happening on steriods. Like I mentioned earlier even the section beyond Hosur Road into NH844 and Denkanikottai Road is happening fast. Earth works are on in full swing. I have witnessed most of these sections myself.

Hopefully rest should be up soon.
And in addition to helping truckers, it helps beleaguered people in Hoskote or Whitefield or parts of North-East Bengaluru, like me who struggle to get to any highway (barring the Tirupati one ). It takes us 2 hours to get to Krishnagiri, 2.5 hours to Nelamangala, 2 hours to get to Mysore road nice entry(this won't change for now I suppose), 2 hours to Kanakapura road Nice entry. This will significantly ease our ingress to Krishnagiri, Hassan, Durga and Chikballapur.

I see a lot of people taking this despite it be a longer stretch going forward, not just truckers.

It is also going to ease traffic significantly for people living near Peenya, Yeshwantpur, BEL, Mathikere etc as most of this will exit at Nelamangala/Dobbespet : and realizing the original benefits of this project.
airguitar is offline   (1) Thanks
Old 11th March 2024, 10:19   #810
Team-BHP Support
 
ampere's Avatar
 
Join Date: Sep 2009
Location: Bangalore
Posts: 18,180
Thanked: 13,356 Times
Re: On Bypassing Bangalore

Quote:
Originally Posted by Rajeevraj View Post
A very critical section in my view. Not only can it take a lot of load off the hosur-attibelle-nice road section, it takes load off nice road and also potentially load off a lot of the smaller roads like Hosur-Bagalur, Attibelle/chandapura - Sarjapur - varthur-hoskote routes and even the KR Puram - Hebbal ORR which sees heavy truck traffic at night.
As of today it would solve North-East-South side problems. But the big one still remains. And if you ask me, thats the most critical one viz. traffic on Nice road.

Unless trucks dont have alternative to reach Dobbaspet from Hosur side, traffic on the Hosur to E-City will wont go down. Hence urgency to quickly build the Hosur-Dobbaspet section.

Of course that does not mean Hosur-Hoskote is less critical!

Quote:
Originally Posted by airguitar View Post
And in addition to helping truckers, it helps beleaguered people in Hoskote or Whitefield or parts of North-East Bengaluru, like me who struggle to get to any highway (barring the Tirupati one ). It takes us 2 hours to get to Krishnagiri, 2.5 hours to Nelamangala, 2 hours to get to Mysore road nice entry(this won't change for now I suppose), 2 hours to Kanakapura road Nice entry. This will significantly ease our ingress to Krishnagiri, Hassan, Durga and Chikballapur.
This part is true. It helps residents get access to the highways faster.