Re: Bangalore Vijayawada Expressway: Construction Updates
A good progress on Greenfield section length around 343 KM with in Andhra Pradesh and remaining length 186 KM which is need to be upgrade both NH 44 and NH66. People also started calling this Highway as BKV expressway ( Bangalore-Kadapa-Vijayawada)
Re: Bangalore Vijayawada Expressway: Construction Updates
Quote:
Originally Posted by SVMBLR
A good progress on Greenfield section length around 343 KM with in Andhra Pradesh and remaining length 186 KM which is need to be upgrade both NH 44 and NH66. People also started calling this Highway as BKV expressway ( Bangalore-Kadapa-Vijayawada)
Yes Earth work is fully on through the entire green field stretch. All the way from NH44 start point just beyond Puttaparthi exit till Addanki.
(1)
Thanks
The following BHPian Thanks ampere for this useful post: