Team-BHP > Commercial Vehicles
Register New Topics New Posts Top Thanked Team-BHP FAQ


Reply
  Search this Thread
10,965 views
Old 13th July 2024, 12:23   #1
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Hello folks,

After almost a year after my last thread in tbhp, I am happy to write down my experience of the Nilgiri Mountain train from a perspective of an Engineer.

And here she is, all set for chugging through memories of another million travelers
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-cover1.png

Intro to the trip

I am from Tamilnadu and Mettupalayam is my parent's hometown. Many times, during summer vacations I have heard the steam engine whistling on its way to the Nilgiris in the distant. Having always wanted to experience it, life stood in-between for almost 3 decades. This year, I created an opportunity in the mask of taking my three and half year-old son on a day trip. Incidentally, we happen to travel on the day before the 125th anniversary of Nilgiri Mountain Railway (June 15) making it extra special.

The only intention of the trip was to experience the steam train and not sight-seeing. So, I booked up and down tickets in same day for the Mettupalayam to Coonoor stretch. This is the steam engine stretch and upwards from Coonoor to Ooty, the diesel engine takes over.

And what I mean by experience is not just as a traveler from platform to platform but more like a 'behind the scenes tour', looking at how the loco is prepared, how it is shunted to the coaches, the maintenance and the kind of back stories from mechanics than entice an Engineer.

As much as the journey, the couple of hours we spent in the Coonoor maintenance yard exploring and talking to the mechanics about the whereabouts of the steam loco were fulfilling. So, you know what to expect!

Intro to the Railway line

I read that the British wanted a respite from the hot weather and developed the hill station as a retreat. And soon, it also became significant for the military which added to the purpose of building a reliable transport means. The 'Nilgiri Railway Company' was registered on September 30, 1885 with a nominal capital of Rs.2.5 million. The first stretch of line from Mettupalayam to Coonoor was constructed between 1886 and 1899 and opened for traffic on June 15, 1899. It boasts the steepest gradient of 1:12 (8% gradability) among all tracks of Indian Railways.

The initial route that ran up to Coonoor was later extended to Fern Hill and till Ooty in the 1900’s.

The track is metre gauge (0.6 meters) and spans 46 kilometers between Ooty and Mettupalayam. A remarkable aspect about the track is that it ascends from an altitude of 1069 Feet to 7228 feet, an impressive 6000+ feet within just 45 kilometres, making it the steepest rail route in Asia and second in the world (source: NMR brakeman's handbook)


What makes it special? The Alternating Biting Teeth (ABT) system

The unique aspect of this railway line is not just the steam locomotives but also what sits in between the two rails of the track.

ABT is a Rack and Pinion arrangement to climb the steep gradient. Between the two rails is a pair of two closely placed racks. Racks in engineering parlance is linear gears. The teeth on the two racks are not in sync, but out of step with each other. To provide a simple analogy, this acts like a ladder for the train to climb up the steep sections.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-abt.png

The hands and legs that work up on this ladder are the 2 gears (a.k.a Pinions / Cogs) on the underside of the train. Another unique aspect here is when I mention "the train", it is not just the loco (popularly referred as Train Engine) but also each wagon (a.k.a rake or coach). Each coach has a pair of cogs that are independent of the loco propulsion. They engage themselves on the teeth on the rack and use them as the steps of a ladder, thus preventing any slip on the steep sections. These are controlled by levers on the coaches by the brakesman.

the cogs are present in the leading axle of each coach.
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-cog.png

Note that only the cogs in the engine are driven by steam power, the ones in coach are engaged to provide traction to prevent slip. They are basically free wheels with only braking.

The racks start to appear amidst the track from Kallar station, which is 20 mins from Mettupalayam. 200m after the train leaves Kallar, the stride gets into full steam as train’s pinions grab onto the racks to climb the steep ascent. The engagement is a noisy affair, and any one with decent observation can point out when the Pinions engage due to the grinding noise and the sudden lurches.

Some numbers taken from the info plates in the museum,
Total Distance: 46 Kms.
Duration Up: 4 hours 45 minutes
Duration down: 3 hours 30 minutes
Number of Stations: 10
Number of Tunnels: 16
Rack & Pinion (ABT) System: 19.5 Km
Number of Curves: 209
Bridges: Large 28, small 98

Gradient Profile,
1 in 40 on the section between Mettupalayam to Kallar,
1 in 12.28 from Kallar to Coonoor (Rack system)
1 in 23 from Coonoor to Udagamandalam.

It is incomprehensible to my mind how they planned this in first place. Credit where due to conceiving this marvel. What must have begun as summer transportation for the brits, evolved into a strategic asset and now over time, it has become a legend in itself!

Story of the Locomotives

The working of Steam Engine

Fuel (Coal, Furnace oil, Diesel and what not!) is used to heat up water in the boiler and once steam is generated, it is manipulated through valves to push the piston. The piston directly drives the wheel through series of connecting rods and link mechanism.

The ability of the valves to manipulate the steam pressure to the piston means that the Torque to the drive the wheels can be controlled. When no power is needed, there is a pressure relief valve at the top of boiler that will release excess steam outside to maintain threshold pressure. It's a safety device that maintains steam pressure in the boiler within the threshold. So, you can see steam bellowing from time to time from the top when the locomotive is at rest.

While the locomotive is producing steam, the amount of water in the boiler is constantly monitored by looking at the water level in a transparent tube, or sight glass. Efficient and safe operation of the boiler requires keeping the level correctly. If the water level is too high, steam production falls, efficiency is lost and water is carried out with the steam into the cylinders, possibly causing mechanical damage. The fireman is responsible for that. He shares the cab duty with the Pilot who manages the locomotion part.

Start-up on a large engine may take hours of preliminary heating of the boiler water before sufficient steam is available. In the case of NMR locos, it takes about an hour thanks to some modern adaptations.

The Drive train

The cylinders are double-acting, with steam admitted to each side of the piston in turn. In a two-cylinder locomotive, one cylinder is located on each side of the vehicle. The cranks are set 90° out of phase.

During a full rotation of the driving wheel, steam provides four power strokes; each cylinder receives two injections of steam per revolution. The first stroke is to the front of the piston and the second stroke to the rear of the piston; hence two working strokes.

Consequently, two deliveries of steam onto each piston face in the two cylinders generates a full revolution of the driving wheel. So, the full 360 degree rotation of the wheel is powered.

Each piston is attached to the driving axle on each side by a connecting rod, and the driving wheels are connected together by coupling rods to transmit power from the main driver to the other wheels.

The arrangement,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-mechanism-3.jpg

The NMR locos are compound locomotives with four cylinders. The two high-pressure cylinders at the bottom on either side are used for the adhesion system and two low-pressure cylinders, positioned above the two main cylinders are used to drive the cogs. The railway parlance for the main drive train powering the wheels is "Adhesion system".

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-cylinders.png

On the easier section of the line, with no rack rail, the locomotives work as two-cylinder simple expansion engines. So, the locomotive can function in 2 modes, the first "compound mode" where the steam powers all 4 cylinders and an "stage mode" where the wheels or cogs can be independently powered. Tractive effort split is 57:43 adhesion to rack drive in the "compound mode". The low-pressure cylinders turned the two rack wheels via a 1 to 2,1 reduction gear. The position of these rack wheels can be seen between the second and third driving axles.

I am not sure why they would want to independently run only the cogs. May be its only for testing. I saw in a video (link attached in next post) where the cog system was running when the engine was idle.

Quite a system like the 4WD and the AWD in the road vehicles!

Once the steam has done its primary job of displacing the piston, then it is directed to the chimney along with the exhaust from the fuel. In the case of NMR though, the steam does additional duty as well. After it does its job of pushing the main piston, sometimes it is diverted to the secondary piston for the ABT system to power the cogs in the locomotive.

But I noticed steam being released at the bottom many times in the stations. I later learnt that steam is also used to clear the cylinder of any residual water that might have condensed inside. It is a critical safety step as any condensed water might lead to piston blow-up as water is not compressible.

The NMR Loco

Some history to begin with,

The locomotives were originally made by a Swiss company (Schweizerische Locomotive and Maschinenfabrik, Winterthur) and are called X class locos in 0-8-2RT configuration. It is said that the very first British made locomotives couldn't perform as expected and the Swiss company proved their mettle!

These engines were purchased in two lots. The first batch of twelve was delivered between 1914 and 1925, and the second batch of five was delivered in 1952. Four more members of the class were built in India between 2011 and 2014, and another two between 2021 and 2022 in Trichy. These engines are homed at Coonoor shed of Southern Railway with periodic overhaul done at Golden Rock Railway works, Trichy.

Specsheet

Size 9990m length, 2490 m wide and 3430m height.
Tare weight 50.3 T
Power 900 hp
Hauling capacity - Approx 97 T
Torque 12179 kg.
Maximum speed
Without Rack: 30 kmph
Rack engaged: 15 kmph
NMR Specific speed limit,
22.5 kmph speed up for MTP to ONR,
11.8 kmph both up and down when ABT is engaged

(Source: NMR Brakesman Handbook)

The Construction of Class X

The locomotive is built like a ladder frame construction, where the boiler, crew cab are attached to the top over a leaf spring suspension. There are approximately 3461 components (253 sub assemblies) in the loco including the motion and brake systems. All elements are mounted on the rigid frame using various fastening methods.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-leafspring.jpg

So, this class of locos have a 5-adhesion wheel assembly. The main connecting link from piston drives the main axle which then links to other axles to propel the loco. In this case 3 other axles take power from one main driven axle.

Layout of the critical parts,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-layout.png

While trying to understand the wheel notation in the Engine specs, I came across an interesting classification.

The Whyte notation is a classification method for locomotives wheel arrangement. The order is "Leading wheels - Powered wheels - Trailing wheels" The NMR locos have the classification of 0-8-2RT, meaning 0 leading wheels, 8 powered wheels and 2 trailing wheels. The RT stands for Rack system. I read that in order to allow for more flexibility in curves, the first and fourth driving axles were movable sideways. Not sure, if this still works that way.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-whyte.png

I couldn't help but relate it to the current truck industry where axle notations are used to denote the powered and free axles configuration.

Energy source

Till I first saw the crew cab of the loco on the day of the journey, I believed that the boiler was coal fed. It was a surprise to see a Spanky cab with no traces of coal litter. Hiding my embarrassment, I went on to strike a conversation with the loco pilot who was sitting on the platform with his earphones on. For a moment, I felt like seeing a F1 driver sitting on the sides of the starting grid preparing for the race.

Now back to the facts,

In 2002 the coal was replaced with oil-fired system and then later to High-speed Diesel. I read that about 4 tons of coal was required for each trip and it was all manually shoveled inside the fire room! I can think of multiple reasons for this evolution and am sure you too will.

the coal? what coal? moment, the interior of the crew cab controls
Photo of old coal litter from the retired engine vs the current one,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-cab.png

Another advantage of the fuel transition is the reduced crew requirement. Coal fired system require two firemen, but now only one fireman needs to travel with the driver. It doesn't stop there, furnace oil is now replaced with high-speed diesel, as it is less viscous and contains less sulfur. Thus, mitigating some environmental damage. The conversions were carried out in Golden Rock Workshop in Trichy in the past decade.

Furnace Oil Spec from the museum

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-furnace-oil.jpg

Periodic Overhaul (POH) of the steam locomotives is done at Golden Rock Railway Workshop in Trichy.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-spec.jpg

Daily maintenance is done at the Coonoor loco shed. Functioning since 1899, the place is a legend in itself! A must visit place for enthusiasts. It is not technically open to public, but the staff are kind enough to let us explore.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-coonor_shed.jpg


Made in India variants

Thanks to a nice video from Golden Rock workshop about reverse engineering the Locos, many aspects of the train that I mentioned are from this reference. Fun fact is the original locos were designed in metric dimensions unlike the British system thanks to the Swiss origin. So considerable time was saved in not having to convert all dimensions in the original drawings. It must have been an exciting project and am sure the hard work is worth it.

Sometime in 2000, the railway workshop started work to make 4 more of these locos. The first one (No. X 37396), named Neela Kurinji, arrived in February 2011 and entered service on March 24 of that year. The second (No. X 37397), Betta Queen, was rolled out at the Golden Rock Railway Workshop in February 2012 and entered service on the railway in March. The third (No. X 37398), also from the Golden Rock Workshop, Nilgiri Queen, entered service in March 2013. The fourth (No. X 37399), named Nilgiri Flycatcher was rolled out on March 5, 2014.

Made in India Neela Kurinji, named after the wildflowers in the hills ready for the day's duty. She had an uphill task (literally!) and she managed it with grace on our date.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-atmtp_generator.jpg
The odd mod job

The steam locos have been retro fitted with on-board generators for powering the burners, blowers, water pumps, oil pumps and auxiliary electrical power. The odd exhaust piping you see jetting out from the cabin area is the aesthetic price for this utility.


Braking system

There are 4 braking systems in the train. Vacum braking, dynamic braking, hand brake and band brake.

As much as the boiler provides the steam power to move, it also plays a role in providing braking effort. This system is called vacuum braking and is actuated by a large master cylinder mounted on the side. This
effort is transmitted by vacuum hoses connected to all coaches from the engine. So apart from the mechanical coupling, there is also a vacuum coupling between the wagons.

I also heard about Steam compression braking from one of the mechanics, but not sure about it. I would assume it to be something similar to engine braking, but steam is let in the cylinder to reduce speed. Would love to know more about it.

The third is the braking system that is similar to the hand brakes. Mainly used to prevent accidental rolling of the adhesion system.

The fourth braking is for the cogs, it's a simple belt-based friction brake used when in rest.
Image of such hand brake implemented in the cog system, the belt loop makes the pattern of infinity. Once the pilot activates the lever, the central pivot rotates to tighten the loop over the wheels.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-rack_drive.jpg

In one of the manuals, I also learnt a new term called "Sprag brake" which was familiar by the method but not the name.

Photo of wedge brake applied in one of the water stops along the way.

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-wedge.png

Braking in the Coaches

Another unique aspect about this train is that the coaches have their own control mechanism for engaging the rack and pinion system. From what I gathered, the red and yellow levers are used for engaging the gears in the track and for applying brakes.

The Pinion is provided on the leading axle. So, there is a coach manager who doubles up as a ticket checker and brakesman. He/She ensures the mechanism is aptly set up in the steep sections and during stops.

image of levers at the back of the coaches (Source: teambhp)
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-levers_coach.png

It is not clear to me how the cogs are engaged (lowered and raised) to the rack. But am sure, it is done individually for each coach by the brakeman.

The coaches are also equipped with Vacuum brake (from Loco) apart from the hand brake for the pinions.

Coach build

The coaches we got to travel were coaches introduced in 1931, rebuilt in 2005 at GOC. Lesser said than better about the coach interior and build. At least the regular ones we got to travel, is all Jugaad work. Nothing heritage nor engineering about it.

Coach specs,
Approx 10.3m, 2026m wide and 3.16 height
Tare weight 13 to 16 Ton

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-rake_details.jpg

I did see some shiny new coaches in the yard though! I later found out that those were made by ICF in 2019 but its a pity, we didn't get to ride in that. I could only see with envy as the coaches were connected to form the next day's train. May be they use it only on the anniversary days!

A mechanic mentioned that the coaches undergo inspection and maintenance after every run at Mettupalayam and they have enough coaches to swap them daily. So, the locos are serviced at Coonoor and the coaches at Mettupalayam.

Water consumption

Approximately 500 liter per km is consumed when chugging up the hill. There are 3 water stops along the route to fill up. That way, there is no need to transport water in a separate wagon. So much for the steam power!

Some more images,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-water-stop-1.jpg

The SS tanks have a capacity of 4500L and are fitted on the either side of the boiler. This kind of mounting is called Pannier type construction. Pannier tanks are box-shaped tanks carried on the sides of the boiler, not carried on the locomotive's running plates. This leaves a space between the tanks and the running plate. Pannier tanks have a lower center of gravity than a saddle tank which sits on the top of the boiler. In this case, we have the diesel tank in saddle position.

An interesting engineering connection I could make with the water tank-boiler design is the ability to supply water to the boiler and maintain pressure inside boiler in the steep slopes. Similar consideration is given in modern day automobiles when designing fuel tank for SUVs (actual ones that offroad!) and Engine oil pan for race cars. An engineering connection from steam engines to Nascar engines, ensuring constant supply of fluids when inclined!

Lubrication

And the stops are also critical to lubricate the joints and bushes. I learnt that there aren't many ball bearings, and it is mostly brass bushings that take up the job of reducing friction. And lubrication system is old school mechanical as well, meaning one has to top up every while to make sure the sliding joints and couplings work smoothly. There were multiple reservoirs mounted near the linkages that lead to a drip type lubrication. Its topped up at each stop by a dedicated person.

video of lubrication oil dripping


Apart from this, there is also a hydrostatic lubrication system in the cabin for the rack and adhesion cylinders.

Fuel consumption

The diesel tank that sits on top of the boiler has a capacity of 1600L and another tank for the generator at 750L. (Source: unofficial southern railway fb page). A mechanic told me it serves good for a day's trip, that is up and down plus shunting duty. This information needs verification. The diesel tank integration is very gracefully done unlike the aux generator.

The large black dome you see on top of the boiler is the diesel tank.

Image of the new loco with diesel and the original heritage one,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-compare_fueltank.png
Note: The loco in the bottom part is one of the original ones brought from Switzerland.

To pull or push?

The Loco is always coupled to the coaches on the downhill side and in the same orientation where the boiler is facing the coaches. Unlike what is popularly mentioned about the orientation of the loco changing when ascending and descending, I found that the loco was attached in the same orientation for both ways.

When I asked the loco pilot about it, he said its mainly to get a good view of the track and there is no technical reason per se. I also realize that the Engine's power output is same for both directions unlike an automobile's powertrain. This is a unique advantage of not having a conventional gearbox-based ICE powertrain where we will need 2x the gears.

In that way the steam system with linkages is similar to Electric motors. An interesting insight in powertrain architecture! As a matter of fact, even the Diesel locos have the same advantage due to the electric traction motors that drive the axles.

Last edited by vivee90 : 25th July 2024 at 12:37. Reason: making it better
vivee90 is offline   (60) Thanks
Old 15th July 2024, 18:39   #2
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

The linkage system

Full disclosure: Inspite of my good grades in Engineering mechanics in my BE, I can't fully explain how the drivetrain geometry and how the reverse is actuated!

I did manage to film the entire mechanism working in the video to figure out at a later time. You can also see the loco pilot manually rotating the lever to slide the mechanism to effect the reverse in my video.



There is something more I couldn't understand, during shunting when the engine was used to assemble the coaches of the next day's train, I noticed the wheels slipping drastically during acceleration. It didn't always happen though, but when it did, it felt like something is wrong!

I am attaching the video below to get some explanation.


Btw, if you are wondering (like me) about modern day solution to the clanky Rack and pinion, then I have you covered. I discovered that some mountain railway systems (https://www.motioncontroltips.com/ra...ch-technology/) use special clutches that prevents roll over in the reverse direction. I found this to be an interesting product, that seems to be so common in many industries but never crossed my mind.

Thanks to the backwork for this article, my engineering depth has significantly improved.

Now, time for some interesting trivia around the world of NMR,

The mechanical crane still in use during overhauling, maintained well in the Coonoor shed,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-img_20240614_150005.jpg

The electrical connection
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-electrical-connector.jpg

A set up to displace stones in the undercarriage of the leading coach. Probably to deflect small stones before the wheels run over. Indi(a)genous, I feel.
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-stone.png

A strange way to couple the speed sensor,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-coupling_wheel-sensor.jpg

The iconic hoot whistle is powered by the same steam system that drives the mighty train. Not just that, there is also a very regular automotive horn in the leading coach that the brakesman use to warn trespassers or signal to the station on arrival.

I read that one ground staff is assigned for every 2km of the track between Mettupalayam and Coonoor. It is mandatory for them to patrol before each run to ensure smooth run.

In popular culture, In Uyire (Dil se) movie the song thayya thayya was shot in the NMR train albeit in a different shade

If you want to know how these machines are taken to and from Trichy for overhaul, I found some photos in the Southern railway FB page(unofficial)
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-truck-loaded.jpg

Last edited by vivee90 : 25th July 2024 at 12:41.
vivee90 is offline   (38) Thanks
Old 23rd July 2024, 10:25   #3
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Tips for the trip and booking

The booking is straightforward as it is for any train in IRCTC. Everyday there is one trip from MTP to Ooty in the morning and return in the evening. On summer weekends there is one more special train. The special train is quite expensive though!

I learnt that it is also possible to charter the whole train privately. It cost around 3-4 lakhs based on the guests and coach type. Seems like a great idea for large crowd like corporate outings or wedding in the Nilgiris.

Image of one such charter rakes, taken downhill as part of the regular train.
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-charter.jpg

The staff were very helpful to answer all my nerdy questions and tried their best to fulfill my curiosity. The museum at Mettupalayam station is a great information trove and I would recommend anyone travelling to spend some time there before or after the trip to fully grasp what the train and track is about. I have collected information from reliable sources to my best and would love to know if there are any differences.

I will finish with the ultimate comparison, 125 years and lot of "Indianisation" after,
Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-compare1.png


I am thankful to the existence of this forum as I will get to learn more and fill the gaps from your interactions. And Sorry for those who expected to see scenic photos of tunnels, bridges and the natural beauty of the hills.

Thanks to my son for patiently bearing with me as I took photos and kept speaking to the staff even long after the last passenger has left! Maybe he will appreciate the trip more when he reads this in future!

Looking forward to your comments and feedback.

Last edited by vivee90 : 25th July 2024 at 12:44.
vivee90 is offline   (54) Thanks
Old 24th July 2024, 23:15   #4
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

References
1. Handbook for NMR Brakesmen. Thanks to the kind soul for uploading in the net.
https://www.slideshare.net/slideshow...y/250005706#16

2. Golden rock making of a coal fired class X loco video

3. Further reading
https://artsandculture.google.com/st...IqMrcCJw?hl=en

4. Engine Specs
https://loco-info.com/view.aspx?id=17208&cookies=accept
vivee90 is offline   (17) Thanks
Old 26th July 2024, 06:22   #5
Team-BHP Support
 
Join Date: Feb 2004
Location: Mumbai
Posts: 20,022
Thanked: 86,428 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Thread moved out from the Assembly Line. Thanks for sharing!
Aditya is offline   (1) Thanks
Old 26th July 2024, 07:13   #6
BHPian
 
Join Date: Jan 2008
Location: Bangalore
Posts: 342
Thanked: 193 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Vivee90,
Thank you for sharing this detailed account. A must visit for an enthusiast!

How are the modern locomotives transported from Trichy to Mettupalayam?
roamingrao is offline   (1) Thanks
Old 26th July 2024, 08:19   #7
Distinguished - BHPian
 
Join Date: Aug 2014
Location: Delhi-NCR
Posts: 4,326
Thanked: 72,279 Times
re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Thank you for this delightful account of this historic national treasure. kudos to Indian railways and their fine men and women who have kept this running in ship-shape to this day.

I travelled up and 11 months later down on this train in 1966 when my father was posted to Staff College Wellington. For a 6-year old it was very exciting. I recall the trip vividly to this day as the train crawled its way up into the misty mountains. Those were more innocent times without layers of security. The trainer driver allowed me into his cabin and I recall seeing that furnace - it was coal fired at the time.

Thank you for writing your essay in a such a lucid and comprehensive manner.

Last edited by V.Narayan : 26th July 2024 at 08:25.
V.Narayan is offline   (11) Thanks
Old 26th July 2024, 11:53   #8
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Quote:
Originally Posted by roamingrao View Post
How are the modern locomotives transported from Trichy to Mettupalayam?
Mostly using trucks with flatbed trailers. I had the same question and have attached a photo in my second post
vivee90 is offline   (2) Thanks
Old 26th July 2024, 12:42   #9
Distinguished - BHPian
 
Join Date: Oct 2012
Location: Delhi
Posts: 8,900
Thanked: 61,432 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Outstanding!! I thoroughly enjoyed reading your thread!! I love everything and anything with Steam!!

I was surprised to read they could fire her up in only one hour? Do you know what sort of new technology they are using to allow for such a rapid start-up?

The big problem with all steam plants is thermal shock. That is why they tend to have such long start-up times. You have to slowly build up the heat, or cracks might develop.

As a general rule, the older the boiler, the longer you might have to take. I am a volunteer on a 1913 small harbour steam tug. We take three full days to fire up our boiler!!

I am not sure why they would run the cog independently, but I do know why it has a clutch so it can be separated from the main engine. When the engine enters from a track with no sprockets onto the sprockets you need to engage the cog on the sprockets smoothly. If it was fixed permanently, it would damage the track on the sprocket mechanism, it can even de-rail the engine I believe.

The reason for having the main drive gear phased 90 degrees apart is to ensure the engine can start from a standstill. A steam engine, when standing still can not start with its position in the top or bottom position. It can not develop torque. so they put right and left-hand side 90 degrees out of sync.

As you correctly state the safety valve can often be seen blowing off some steam when standing idle. However, that is also a waste of steam/water. So the engineers would also throttle back on the fuel flow to the burner! It is a very delicate thing. The fireman would work the engineer because you want to start throttling back on the fuel flow, long before the train comes to a stop. So it all depends on how heavy the train is, what speed, going up or downhill and so on.

When at a standstill, ideally the fuel flow is regulated in such a way it just maintains boiler pressure. You can begin to understand how difficult all of this would be with a coal-fired boiler. Much more difficult to control the amount of heat going into the boiler.

Most Coal-fired boilers would have some mechanism to lose heat from the coal fire quickly.

When we lived in Delhi I visited a well known Steam Engine Shed several times. Can't quite remember what it was called or where it was located. But I could easily drive out there on my 1974 Bullet. It was also home to one of the (then) still-running large Steam Engines, Akbar. We took a trip back and forth with her to one of the Tiger Reserves (Sariska I seem to recall)

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-img_3716.jpg

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-img_3714.jpg

Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway-img_3709.jpg

Great trip, nothing like travelling on a steam train!!

Jeroen

Last edited by Jeroen : 26th July 2024 at 12:48.
Jeroen is offline   (26) Thanks
Old 26th July 2024, 15:30   #10
BHPian
 
vivee90's Avatar
 
Join Date: Jan 2016
Location: Nagpur
Posts: 145
Thanked: 702 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Quote:
Originally Posted by V.Narayan View Post
Thank you for this delightful account of this historic national treasure. kudos to Indian railways and their fine men and women who have kept this running in ship-shape to this day.
Thank you sir. Very happy to see your response and its motivating.

Quote:
Originally Posted by Jeroen View Post
I was surprised to read they could fire her up in only one hour? Do you know what sort of new technology they are using to allow for such a rapid start-up?
Bedankt I am glad you enjoyed it. I am a big fan of Sirion and your garage. Brings back memories of my time in the Netherlands!

About the starting time, this is what one of the mechanics told me. If that number seems off, I will verify with someone from the railways about it. Currently, they have added external powered blowers to improve thermal efficiency not sure if that leads to faster steam generation at start.

Thank you for the explanations. Regarding crank offset, I assume we can draw analogy to how we pedal in the bike? We always tend to bring the pedal to the middle when we start rather than in Top or bottom point.
vivee90 is offline   (5) Thanks
Old 26th July 2024, 15:47   #11
Distinguished - BHPian
 
Join Date: Oct 2012
Location: Delhi
Posts: 8,900
Thanked: 61,432 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Quote:
Originally Posted by vivee90 View Post
Regarding crank offset, I assume we can draw analogy to how we pedal in the bike? We always tend to bring the pedal to the middle when we start rather than in Top or bottom point.
Spot on! To us it comes natural, but in an engine you need to design it for that very purpose. Single piston steam engines need to be turned into a starting position as well, if they stop near top or bottom.

Jeroen
Jeroen is offline   (4) Thanks
Old 26th July 2024, 21:30   #12
Senior - BHPian
 
VijayAnand1's Avatar
 
Join Date: Oct 2013
Location: Stickn' Around
Posts: 1,278
Thanked: 3,554 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Being an Ooty-ite, and a thorough aficionado of the X Class and the duty she's doing through and along, this thread notched it up and is simply a graceful complement to the outstanding, simple and indefatigable workhorse she is. The astuteness of an engineer, the sound and sight he hears and sees is simply one that differentiates between a passenger and a delightful enthusiast. vivee90, you sir, did a fantastic job!!

Cheers!
VJ
VijayAnand1 is offline   (2) Thanks
Old 27th July 2024, 05:44   #13
Senior - BHPian
 
Join Date: Sep 2019
Location: Pune
Posts: 2,742
Thanked: 8,510 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

My grandfather should have been alive to this day to read this post. He would have added a few precious pearls of wisdom from his experiences as a Steam + diesel (WDM2) loco pilot in Central Railway ! And yes he did experience this particular rack rail system and used to tell us about it.

BTW another chapter of railway operations will transition to history -the ubiquitous trunk!

https://economictimes.indiatimes.com...7.cms?from=mdr
fhdowntheline is offline   (1) Thanks
Old 27th July 2024, 07:35   #14
BHPian
 
Foxbat's Avatar
 
Join Date: May 2009
Location: NYC / Lucknow
Posts: 703
Thanked: 4,126 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Great writeup and wonderful pictures! Appreciate all the effort explaining the mechanical systems so a layman can understand. Steam trains were once a fascination for me also so much that after my first year in Engineering college I went for a 2 months internship in the Indian Railways just for fun.

One of my biggest surprises was when I learned that the diesel engines never directly drove the wheels (they did so by powering the electric motors).
Foxbat is offline   (2) Thanks
Old 28th July 2024, 03:47   #15
BHPian
 
Join Date: Jul 2024
Location: Coimbatore
Posts: 85
Thanked: 67 Times
Re: Tech Travelogue of the 115-year old Nilgiri Steam Mountain Railway

Quote:
Originally Posted by vivee90 View Post

And lubrication system is old school mechanical as well, meaning one has to top up every while to make sure the sliding joints and couplings work smoothly. There were multiple reservoirs mounted near the linkages that lead to a drip type lubrication. Its topped up at each stop by a dedicated person.
@vivee90, thank you for the fantastic write-up.

Specifically on the topic of lubrication, does this mean the oil is continuously draining to the ground? Would that be mineral oil or synthetic oil? If it is synthetic oil, wouldn't that be quite a bit of environmental pollution on every trip?
1.2GT3GT is offline   (1) Thanks
Reply

Most Viewed


Copyright ©2000 - 2025, Team-BHP.com
Proudly powered by E2E Networks